WMSmart: The Ultimate Guide to Features & Benefits

Migrating to WMSmart: Step-by-Step Implementation PlanMigrating to a new warehouse management system (WMS) is a strategic undertaking that directly affects inventory accuracy, order fulfillment speed, labor productivity, and overall customer satisfaction. WMSmart positions itself as a modern, configurable WMS built to support businesses of various sizes — from SMBs scaling up to enterprise operations. This step-by-step implementation plan outlines the stages, roles, tasks, risks, and best practices to migrate successfully to WMSmart with minimal disruption.


Executive summary

Migrating to WMSmart requires careful planning across six phases: discovery, planning, infrastructure & integrations, data migration, testing & training, and go-live & optimization. Each phase includes specific deliverables, stakeholders, and acceptance criteria. When executed methodically, the migration will deliver improved throughput, inventory accuracy, and visibility — typically within 6–16 weeks for mid-sized operations depending on complexity.


Phase 1 — Discovery & stakeholder alignment

Goal: Define objectives, success metrics, scope, constraints, and key stakeholders.

Key activities:

  • Assemble a cross-functional steering committee (operations, IT, supply chain, finance, customer service).
  • Define business objectives (e.g., reduce picking errors by 60%, cut order cycle time by 30%).
  • Map current state workflows: receiving, putaway, picking, packing, returns, cycle counting.
  • Inventory systems landscape: ERP, e-commerce platforms, TMS, barcode scanners, conveyors, sortation, labeling systems.
  • Identify regulatory/compliance needs and SLA commitments.
  • Create a migration risk register.

Deliverables:

  • Project charter with scope, timelines, and resource commitments.
  • High-level process maps and systems inventory.
  • Success metrics and KPIs.

Acceptance criteria:

  • Steering committee sign-off on objectives and scope.

Phase 2 — Detailed planning & design

Goal: Translate objectives into a detailed project plan and WMSmart configuration blueprint.

Key activities:

  • Define project plan with milestones, workstreams, and resource allocation.
  • Conduct requirements workshops for each warehouse process and exception handling.
  • Design WMSmart configuration: zone/rack/bin structure, replenishment rules, slotting strategy, wave and batch picking logic, task priorities, and user roles/permissions.
  • Plan integrations: APIs or middleware for ERP, OMS, carriers, and IoT devices.
  • Network and hardware assessment: Wi‑Fi coverage, mobile devices, label printers, scanners, PLC interfaces.
  • Data readiness assessment: SKU master, BOM, locations, suppliers, customers, historical transactions.
  • Cutover strategy: big bang vs. phased vs. parallel run.

Deliverables:

  • Functional design document (FDD) and technical design document (TDD).
  • Integration specifications and data mapping spreadsheets.
  • Cutover and rollback plans.

Acceptance criteria:

  • Business and IT sign-off on FDD/TDD and cutover approach.

Phase 3 — Infrastructure & integrations

Goal: Build or provision the technical environment and integrate WMSmart with upstream and downstream systems.

Key activities:

  • Provision environments: development, testing, staging, production.
  • Configure network infrastructure and ensure secure connectivity (VPN, firewalls).
  • Install/configure mobile terminals, label printers, and RFID or barcode hardware.
  • Develop and test APIs or middleware connectors for ERP, e-commerce, carriers, and WMSmart.
  • Establish monitoring, logging, and alerting for integrations.
  • Implement security controls, user authentication (SSO/OAuth) and role-based access.

Deliverables:

  • Operational environments with validated connectivity.
  • Working integration endpoints and test harnesses.
  • Hardware installation and device enrollment.

Acceptance criteria:

  • Successful end-to-end data flows in a controlled test environment.

Phase 4 — Data migration & master data validation

Goal: Move accurate, clean master and transactional data into WMSmart.

Key activities:

  • Extract and transform data from source systems: SKU attributes, units of measure, locations, suppliers, customers, open purchase orders and sales orders, on-hand inventory.
  • Cleanse data: deduplicate SKUs, normalize units, correct location naming, fix invalid SKUs.
  • Load master data into WMSmart using validated import tools or APIs.
  • Reconcile inventory totals and document variances with root-cause analysis.
  • Implement barcoding/label standards and print location/SKU labels as needed.
  • Prepare initial stock movement plans for putaway.

Deliverables:

  • Migrated master data sets and reconciliation reports.
  • Barcode/label templates and printed labels.
  • Inventory variance log and remediation plan.

Acceptance criteria:

  • Inventory counts in WMSmart match agreed-upon tolerances versus source systems or physical counts.

Phase 5 — Testing & training

Goal: Validate system behavior across real-world scenarios and prepare staff to operate the new WMSmart workflows.

Key activities:

  • Create test plans and cases: unit tests, integration tests, performance tests, regression tests, and user acceptance tests (UAT).
  • Conduct picking/packing/receiving/returns simulations, including edge cases (short shipments, damaged goods, lot/serial traceability).
  • Load-test peak throughput scenarios to confirm system and network scalability.
  • Train super-users and then end-users: role-based training, quick-reference guides, and troubleshooting playbooks.
  • Run parallel operations (if chosen) to compare results and adjust.

Deliverables:

  • Test case execution reports and defect logs.
  • Trained user rosters and training materials.
  • Operational runbooks and escalation paths.

Acceptance criteria:

  • UAT sign-off with all critical defects resolved or mitigated.
  • Users demonstrate competence on core tasks.

Phase 6 — Go-live & hypercare

Goal: Move to production and stabilize operations while minimizing disruption.

Key activities:

  • Execute cutover plan: final data sync, freeze changes in source systems, redirect integrations, and enable WMSmart for live operations.
  • Monitor KPIs closely: picking accuracy, order cycle time, throughput, carry inventory variance.
  • Provide on-site/remote hypercare support: assigned SMEs, rapid incident response, daily review meetings.
  • Triage and resolve post-go-live issues; prioritize fixes by business impact.
  • Communicate status to stakeholders and customers as needed.

Deliverables:

  • Go-live confirmation and hypercare schedule.
  • Issue tracker with SLAs for resolution.
  • Post-go-live lessons learned log.

Acceptance criteria:

  • Stable operations within predefined SLA thresholds and stakeholder sign-off to reduce hypercare.

Phase 7 — Continuous improvement & optimization

Goal: Realize full value from WMSmart through ongoing refinement.

Key activities:

  • Analyze performance vs. baseline KPIs and identify improvement opportunities (slotting, pick paths, labor allocation).
  • Implement iterative enhancements: automation rules, advanced picking strategies (batch, zone, clustered), and integrations (carrier rate shopping).
  • Regularly review master data hygiene and cycle counting policies.
  • Establish governance for change requests, releases, and training refreshers.
  • Plan phase 2 features (e.g., voice picking, robotics, predictive replenishment).

Deliverables:

  • Roadmap for optimization and feature rollouts.
  • Regular KPI dashboards and governance meeting notes.

Acceptance criteria:

  • Demonstrable improvements in key metrics and stakeholder approval of ongoing roadmap.

Risks, mitigation, and common pitfalls

  • Poor data quality — mitigate with early data profiling, cleansing, and small test loads.
  • Insufficient Wi‑Fi/device readiness — run RF site surveys and pilot devices.
  • Undertrained staff — invest in intensive role-based training and super-user programs.
  • Overly aggressive cutover — prefer phased cutover or parallel runs for complex operations.
  • Integration failures — use robust middleware, contract SLAs with providers, and thorough integration testing.

Timeline example (mid-sized warehouse)

  • Discovery: 1–2 weeks
  • Design & planning: 2–4 weeks
  • Infrastructure & integrations: 2–6 weeks (parallel workstreams)
  • Data migration: 1–3 weeks
  • Testing & training: 2–4 weeks
  • Go-live & hypercare: 1–2 weeks
    Total: 9–21 weeks depending on complexity.

Roles & responsibilities

  • Executive Sponsor — decisions, budget, escalation.
  • Project Manager — timeline, coordination, risk management.
  • Business Process Owner — defines workflows and acceptance criteria.
  • IT Lead — integrations, networks, security.
  • WMS Administrator — configuration and ongoing support.
  • Super-users/Trainers — day-to-day training and first-line support.
  • Vendors/Integrators — provide technical implementation and customization.

KPIs to track (examples)

  • Order accuracy (%)
  • Orders per hour / picks per hour
  • On-time shipments (%)
  • Inventory accuracy (%)
  • Cycle count variance
  • Dock-to-stock time

Final notes

Successful migration to WMSmart hinges on strong cross-functional governance, clean data, thorough testing, and focused training. Treat the project as both a systems migration and a change-management initiative: people and processes need as much attention as the technology itself.